Projects
Todd Road Branch Sewer
Project :

Todd Road Branch Sewer

Client :

Cook Street Property Developments

Description :

Construction of Todd road Branch Sewer, approximately 382 m of pipe using microtunnelling. This project involved caisson, manholes construction and live sewer works
(Caisson Ø: 2.7m - 3.5m – 4.5m, manholeØ: 1.5m, pipe 427 OD Hobas)

Anderson Road, Exxon Mobile Fuel Pipeline Diversion Shafts
Project :

Anderson Road, Exxon Mobile Fuel Pipeline Diversion Shafts

Client :

Thiess

Description :

Construction of two shafts for the relocation of the Somerton pipeline using the Rock Splitting method and rock anchors.

Shaft Dimensions: 7m x 3.8m x 14m deep

                              5m x 3.6m x 14m deep

Armstrong Creek Trunk Sewer Pipeline
Project :

Armstrong Creek Trunk Sewer Pipeline

Client :

Barwon Water Alliance

Description :

Construction of the Armstrong creek truck sewer east stage 1,  approximately 1165 m of pipe (700Ømm GRP, 600Ømm GRP, 800Ømm RCP, 500Ømm RCP) using Open cut trenching and Microtunneling and also it involved Manholes construction with a diameter of 1500mm.

Southern Precinct Dual Pipeline
Project :

Southern Precinct Dual Pipeline

Client :

Barwon Water Alliance

Description :

The Southern Precinct Dual Pipeline transfers potable water and recycled water. This Project involved the construction of  3850 m of pipe using Open cut trenching, Directional drilling  and Microtunneling. (225Ømm, 300Ømm PE pipe, DN 825 RC encasing 711OD, DN 525 RC encasing 337OD, 825Ømm, 525Ømm RC, 711Ømm, 337Ømm MSCL)

Barwon Heads Sewer Crossing
Project :

Barwon Heads Sewer Crossing

Client :

Barwon Water Alliance

Description :

Upsizing of 15 m of 375 Ø GRPpipe using Open cut trenching.

Horseshoe Bend Road Sewer Stage 2
Project :

Horseshoe Bend Road Sewer Stage 2

Client :

Barwon Water Alliance

Description :

The project involved the construction of 660 m of sewer(400Ømm VC Jacking pipe, 400Ømm VC pipe, 300Ømm PVC pipe), using Open Cut trenching and Microtunnelling and also involves the construction of 8 Manholes with a diameter of 1500mm along Horseshoe Bend Road in the Torquay area, Victoria.

Chapel Street Sewer Reticulation and Sanitaria Plumbing Extension
Project :

Chapel Street Sewer Reticulation and Sanitaria Plumbing Extension

Client :

Fridcorp

Description :

The project involved the construction of 127m of 150mm and 225mm PVC pipe for sewer, using Open Cut trenching and microtunnelling. This Project was located in the South Yarra area.

Bellarine Basin Pipeline
Project :

Bellarine Basin Pipeline

Client :

Utility services

Description :

The project included the construction of 215 m of water supply using Open Cut trenching in the Wallington area, Victoria. Pipe used 711Ømm MSCL with a depth of 2.4 meters

Erlandsen Avenue, Sorrento Project
Project :

Erlandsen Avenue, Sorrento Project

Client :

Utility services

Description :

This project involved the construction of a pressure sewer main with a length of 115 m of 63mm PE pipe and a depth of 3.5 m.

Construction of gravity sewer and decommissioning of SPS120/SPS122 Werribee
Project :

Construction of gravity sewer and decommissioning of SPS120/SPS122 Werribee

Client :

Fortunato Group

Description :

Installation of 620 m of pipe (150 Ø PVC) using microtunneling.

Lyndhurst Sewer Pump Station
Project :

Lyndhurst Sewer Pump Station

Client :

Thiess Services

Description :

This project involved the construction of 1092 m DN 225mm and 300mm PVC pipe, DN 280mm PE pipe and DN 750mm HOBAS for sewerage and a pumping station, using Open Cut in the Lyndhurst Area, Victoria.

Thrift Park Mentone
Project :

Thrift Park Mentone

Client :

South East Water

Description :

300 m of a sewer line with a 225mm Vit clay pipe using microtunnelling with bore shafts positioned at intervals along the job. This project was constructed in a busy residential area.

Kelvinside Relief Sewer
Project :

Kelvinside Relief Sewer

Client :

Utility Services

Description :

The project included the construction of 390 m of gravity relief sewer using Trenchless (microtunnelling), Open Cut and also the construction of 5 Manholes with diameter of 1050mm and depth to invert between 4 and 6 m along Kelvinside rd, Victoria

Braeside Water Main Stage 2A-2B
Project :

Braeside Water Main Stage 2A-2B

Client :

Utility Services

Description :

This project involved the construction of 1969 m of 300mm and 375mm PVC pipe and 355mm and 450mm of PE pipe for a water main, using Directional drilling method and Open cut trenching in the Braeside area.

Matilda Court Sewer Diversion
Project :

Matilda Court Sewer Diversion

Client :

Barwon Water Alliance

Description :

Construction of 320 m of 375mm PVC pipe with 5 manholes and live sewer cut in at either end. Pipe was installed in 500mm microtunnelles sleave which was bored using caisson shafts at each manhole location up to 10m deep